FGM Solar
Request a proposal
Il cantiere di Salteras visto dal drone

ABOUT US

The power of the sunfor the world of tomorrow.

since 2013

FGM Solar has been building utility-scale solar plants since 2013. We do not design slide decks: we assemble fields of tens of megawatts, with our own crews, on sites that run for months and do not stop when it rains.

We started out as a mechanical works contractor and became the single point of contact for the entire construction side of a solar park: civil, mechanical and electrical works under one management. For an EPC that means one contract, one schedule and one person responsible when something goes wrong — which on site it always does.

Today we work in ten countries across four continents, with our base in Oradea, Romania, and live sites in Spain, Germany, the Netherlands and Italy. The crews move from one project to the next: it is why a method learned in Lelystad in 2019 is applied at Salteras today, instead of being lost every time a site closes.

13YEARS OF CONSTRUCTION
2.4GWpINSTALLED
10COUNTRIES · 4 CONTINENTS
140MWpLARGEST PROJECT

DISCIPLINE

One contractor,three trades.

Montaggio delle strutture e dei moduli visto dal drone
01 / 03 — DISCIPLINE

Mechanical works

This is the visible part: thousands of piles driven to controlled verticality, fixed structures assembled row by row, modules laid and torqued to nominal values.

On a hundred-megawatt field the difference between one crew and another is not first-day speed: it is holding the same geometry on day one hundred and forty, when it rains and the ground gives way.

  • PILE DRIVING
  • FIXED STRUCTURES
  • TRACKERS
  • MODULE INSTALLATION
  • TORQUE CONTROL
Scavo dei cavidotti con escavatore fra le file
02 / 03 — DISCIPLINE

Civil works

Site preparation, internal access roads, cable trenching, foundations for substations and inverters, final reinstatement.

It is the work nobody photographs and that determines everything else: a trench off level or an access road that gives way in the rain will stop the assembly long before any supply delay does.

  • SITE PREPARATION
  • ACCESS ROADS
  • TRENCHING & BACKFILL
  • FOUNDATIONS
  • REINSTATEMENT
Cablaggio in corso all'interno di un quadro elettrico
03 / 03 — DISCIPLINE

Electrical works

Cable laying in trench and on tray, DC and AC wiring, inverter connection, MV/LV substations, testing and commissioning.

This is where a plant's reliability for the next thirty years is decided. Every string is tagged, tested and recorded: if a contact is wrong we want to know before handover, not in the third winter.

  • CABLE LAYING
  • DC/AC WIRING
  • INVERTERS
  • MV/LV SUBSTATIONS
  • COMMISSIONING

How we measure ourselves

Our work is judged on three things: tolerances met, injuries avoided and the energisation date. The rest is marketing.

THE GROUP

01FGM Solar S.R.L.Oradea · Romania
02FGM Solar Renewable S.R.L.Oradea · Romania
03Solar Concept Tecnology S.R.L.Oradea · Romania

LET'S WORK TOGETHER

Have a field to build?We have the crews.

LET'S TALK